Campbellsport Fire Station

Campbellsport Fire Station was built in 1993. Before the fire station was able to be built the house that was on the property was used as a live burn for training as well as clearing the space for the new fire station. The official ground breaking was Saturday April 17, 1993 at 11:00 am. Wiscontech Inc was the construction manager. This $434,403 facility was paid for by many different fund raisers. One of the main fund raisers for the fire station was when the Campbellsport Fire Dept. played the Green Bay Packer All-Star Basketball Team. There was an autograph session by Packer players at half time, and autographed footballs were given away. There was a half court shooting contest at half time and proceeds to be used for purchasing the Amkus Extrication tools.
Sub Contractors
| Asphalt | Fond du Lac Asphalt |
| Concrete | Dennis Proeber |
| Precast | Mid States |
| Trench drain | D.C.S.E. |
| Masonry | Dennis Proeber |
| Steel material | Vulcan |
| Carpentry | Lindsley Construction/ Fire Dept. Members |
| HM labor | |
| Metal panel ceiling | |
| Flooring | |
| Roofing | |
| Soffits | |
| Membrane roofing | M. Tighe |
| Caulking | Frisch |
| Stucco | Quantum Energy |
| HM Material | Precision Metals |
| Aluminum & glass | Sheboygan Glass |
| Overhead doors | Mid-Wisconsin Raynor |
| Suspended ceiling | Ver Halen |
| Painting | Omni |
| Specialties | John Buhler |
| Plumbing | Ahern-Gross (int) |
| Mueller Excavating (ext) | |
| HVAC | Paul Van Zeeland |
| Electrical | W.J. Leasa |
Any problems or questions with the website contact cfdwebmaster@verizon.net