Campbellsport Fire Station

   
 

Building the Station

 

Inside the Station

 

Our Gear

 

2007 Call Statistics

 

Campbellsport Fire Station was built in 1993. Before the fire station was able to be built the house that was on the property was used as a live burn for training as well as clearing the space for the new fire station. The official ground breaking was Saturday April 17, 1993 at 11:00 am. Wiscontech Inc was the construction manager. This $434,403 facility was paid for by many different fund raisers. One of the main fund raisers for the fire station was when the Campbellsport Fire Dept. played the Green Bay Packer All-Star Basketball Team. There was an autograph session by Packer players at half time, and autographed footballs were given away. There was a half court shooting contest at half time and proceeds to be used for purchasing the Amkus Extrication tools.

 

Sub Contractors

Asphalt Fond du Lac Asphalt
Concrete Dennis Proeber
Precast Mid States
Trench drain D.C.S.E.
Masonry Dennis Proeber
Steel material Vulcan
Carpentry Lindsley Construction/

Fire Dept. Members

HM labor
Metal panel ceiling
Flooring
Roofing
Soffits
Membrane roofing M. Tighe
Caulking Frisch
Stucco Quantum Energy
HM Material Precision Metals
Aluminum & glass Sheboygan Glass
Overhead doors Mid-Wisconsin Raynor
Suspended ceiling Ver Halen
Painting Omni
Specialties John Buhler
Plumbing Ahern-Gross (int)
Mueller Excavating (ext)
HVAC Paul Van Zeeland
Electrical W.J. Leasa

 